ALUR PHASE-1
CONSTRUCTION OF 1-BHK(B+G+3 FLOORS) HOUSING PROJECT AT ALUR VILLAGE PHASE-1.
AMENITIES:
POWER SUPPLY, BWSSB CAUVERY, WATER SUPPLY, PARK TWO STAIRCASE & TWO LIFTS, FOR EACH BLOCK, COMMON AREA & STREET LIGHT GENERATOR BACKUP
LOCATION:
ALUR...
Kaniminike Phase-5
START FROM PRICE:Rs.64 LAKHS,Parking Fee:Rs.250000,CONSTRUCTION OF 3 BHK(BASEMENT+STILT + 9 FLOORS)HOUSING PROJECT AT SY.NO.95 OF KANIMINIKE VILLAGE, KENGERI HOBLI, BANGALORE SOUTH
AMENITIES:
BASEMENT AND STILT LEVEL CAR PARKING, POWER SUPPLY, WATER SUPPLY, CHILDREN'S PLAY AREA, TWO...
Thippasandra 1BHK
CONSTRUCTION OF 1-BHK(B+G+5 FLOORS) HOUSING PROJECT AT THIPPASANDRA(NEAR JP NAGAR 9TH PHASE.)
AMENITIES:
POWER SUPPLY,WATER SUPPLY, PARK TWO STAIRCASE & TWO LIFTS, FOR EACH BLOCK, COMMON AREA & STREET LIGHT GENERATOR BACKUP
LOCATION:
THIPPASANDRA (NEAR...